| 1.0 |
Considerations for a Progressive Strip Layout |
| |
|
| |
1.1 Part Connection Points |
| |
1.2 Unfolding the Part for Material Requirements |
| |
1.3 Evaluation of Different Nesting Scenarios |
| |
|
| 2.0 |
Manufacturing Process of Progressive Strip |
| |
|
| |
2.1 Determining the Operations Required |
| |
2.2 Determining the Sequence of Operations |
| |
2.3 Carrier Selection |
| |
2.4 Compatibility Issues Related to Layout, Carrier & Operations Selections |
| |
2.5 Requirements for Idle Stations |
| |
2.6 Breakdown of Gutting & Trimming Stages |
| |
|
| 3.0 |
Progressive Strip Layout Verification |
| |
|
| |
3.1 Carrier Size & Strength |
| |
3.2 Strip Length vs. Production Capabilities |
| |
|
| Exercises: Reviewing Strip Layouts for Potential Issues |
| |
|